Just H&A_transparent.png

Location

Eastham, MA

Revitalization

  • Exterior plaza restoration included secure vestibule addition, concrete slab replacement, accessibility and life safety improvements


  • Replaced 20,000 sq. ft. of windows

 

  • Designed a 120,000 sq. ft. roof replacement


  • Window and roof replacements adhered to Massachusetts School Business Authority (MSBA) Accelerated Repair Project Regulations


  • Performed a Facilities Condition Assessment 


  • Phased renovation to two science labs

Habeeb & Associates Architects was initally hired for a Massachusetts School Building Authority (MSBA) Accelerated Repair Project. Under the contract, H&A completed a study which recommended roof and window replacements. The resulting scope of work consisted of replacing 120,000 square feet of EPDM roof, and approximately 20,000 square feet of windows.


H&A was later awarded an On-Call/House Doctor contract with Nauset Regional School District. Some of the projects above were completed under that contract, as were the exterior plaza restoration, renovation of science labs, and others. In addition, Middle School renovations included security hardware upgrades to the classrooms, a study of the auditorium, and exterior stairs and walkway upgrades.

Nauset Regional High School

 

VISIT US 

TODAY

  • Grey Instagram Icon
  • Grey Facebook Icon
  • Grey LinkedIn Icon

H&A Boston

    

150 Longwater Drive, Suite 201

Norwell, MA 02061

Phone: (781) 871-9804

Email: Architects@habeebarch.com

H&A Worcester 

 

100 Grove Street, Suite 303

Worcester, MA 01605

H&A Rapid City 

  

5201 Waxwing Lane

Rapid City, SD 57702